This is the first deep structure designed by Arup in Italy, with a rail level 25m below ground.
Above the station there is a 450m long steel roof defined by a cylindrical surface formed by a steel diagrid structure.
The rail level is connected to the ticket zone at mezzanine level and the ground floor concourse by a system of escalators, travelators, and lifts.