Rodriguez Water Treatment Plant

This project comprises an intake structure to be built inside the La Mesa Dam connected to a 1.8m diameter tunnel with an approximate length of 4.7km, a 150m litres per day water treatment plant and a reservoir.

Arup has been appointed by Manila Water to provide project management services for the project. The firm will assist with the procurement of a design and build contractor, conduct a detailed design review, administer the contract and manage construction up to handover.

The project is planned for completion by mid-2011.

Share:

  • Rodriguez Water Treatment Plant, Manila - the project is composed of an intake structure to be built inside the La Mesa Dam.

    The project is composed of an intake structure to be built inside the La Mesa Dam.