Brighouse in the Calder Valley has been subject to flooding on 43 occasions since 1827. The community needed a scheme to better protect homes, businesses and transport links in the area with durable flood defences. As the risk management authority, the Environment Agency needed a solution that was socially, economically and environmentally sustainable.
Arup developed a comprehensive scheme to reduce flooding across the town and increase the community’s resilience to flood events. This involved refurbishment and repair to extend the life of existing flood defences, construction of new flood defence assets, and creation of five landscaped washland areas designed to slow the flow and mitigate the impact of rising flood waters. Our work involved optioneering and detailed design, environmental impact assessment, securing planning permission and supporting the construction process.
The scheme has helped unlock the economic potential of Brighouse as a focal point for regeneration in the Calder Valley. It reduces flood risk to over 350 commercial and 55 residential properties, and the main highway connection from Calderdale to the M62.
The combination of measures implemented minimises carbon costs and maximises benefits for nature, the environment and the surrounding community – exceeding biodiversity net gain targets and improving amenity space within the town.
A collaborative approach to flood risk management
Our work involved close collaboration with the Environment Agency’s professional partners to align designs with wider programmes and future development strategies for transport, economic and housing growth.
Brighouse plays a vital role in West Yorkshire’s economy through its strong manufacturing heritage and strategic location within the Leeds City Region – supporting trade and investment across the UK and beyond. Significant development is in progress in and around the town to foster inclusive growth, boost local employment, and position Brighouse as a vibrant hub for enterprise and community life in Calderdale and the wider region. Improving the flood resilience of Brighouse’s commercial properties and transport infrastructure supports these efforts.
Our collaboration with the EA’s partners, particularly Calderdale Council, helped identify further opportunities to broaden benefits to the community. In two local public parks, attenuation basins were created. These landscaped structures are designed to temporarily store excess water before gradually releasing it into the drainage system. Working with the council, our landscape designs incorporate an active travel corridor and a course for a park run along footpath routes for people to enjoy.