Oaklands Park in Adelaide’s south is a vibrant suburb with retail outlets, healthcare facilities, an elementary school, and a busy train station. Cutting through this busy area was a railroad crossing used by up to 40,000 vehicles every day. Trains were also speed-restricted in and out of the station due to uncontrolled pedestrian and cyclist movements across the rail corridor. For these reasons, the railroad crossing was flagged by the Department for Infrastructure and Transport (the Department) to be removed.
We worked with the Department, McConnell Dowell, and Mott MacDonald in an Alliance to deliver a solution that removed the railroad crossing by locating the new station’s platforms below street level. This allowed trains to pass underneath the traffic it had once interrupted and as a result, opened the area to pedestrians and cyclists, unlocked the roads for drivers, and created a more connected community area.
By removing the railroad crossing, the station area now encourages walking, cycling, and the use of public transportation in what was previously an area dominated by vehicles. The greatly improved pedestrian and bicycle connectivity, safety, and accessibility result in a station area that encourages safe transportation across all modes.
Minimizing disruption within a complex and constrained environment
The station site was immediately adjacent to an existing operational metropolitan rail line and surrounded by major arterial roads and an intersection, making it critical that the design and staging minimized impacts on rail and road services and the public and local businesses during construction. The key elements were:
Constructing the new station offline, with the adjacent existing station remaining functional for the duration of the project, having minimal impact on station users.
Lowering the Seaford rail line underneath Morphett Road with a top-down construction approach, allowing the new rail line to be constructed offline and adjacent to the existing live rail.
Designing the bridge construction to be undertaken in halves.
This staged construction of the road bridge and off-line construction methodology enabled the fully commissioned station to be stitched onto the live network through only one main 24-day closure of rail services.
Previous local rail projects saw lines closed for months at a time, whereas Oaklands Crossing only required a few weeks. Roads continued to flow, the previous station continued operation, and the final occupation was kept to an absolute minimum.
The station area now encourages walking, cycling, and the use of public transportation in what was previously an area dominated by vehicles.
The deliberate decision to create a place for passengers and the public to gather saw the excavated area of the station area reduced and green space maximized at ground level both north and south of the station. The design also made it possible to retain a pre-European remnant river red gum tree, which now forms a significant placemark in the upper plaza level of the station.
Working with COX Architects and ASPECT Studios to improve the local landscape, the station is now easily accessible and has excellent passive surveillance to make it feel safe both day and night. By designing infrastructure to meet and respond to the needs of the people who use it, we have helped to create a place for passengers and the public to gather and enjoy themselves.
The universal use of 3D design tools
Universal adoption of 3D design tools was key to the project’s success, helping to create a truly collaborative approach across all disciplines. Each discipline designed and modeled using 3D software, and models were shared daily and combined weekly for coordination and clash detection. This process enabled the complex and potentially competing demands from each discipline to be evaluated against each other, optimizing the design as the project progressed.
The design was communicated to the construction team through a combination of conventional drawings and 3D models, which helped to minimize additional requests for information during the site phase.