National Ombudsman, The Hague

Adapting existing installations within a limited amount of time

As part of the renovation of the ground floor of the National Ombudsman building, we helped Cie Architects to decide which parts of the existing installation systems could be reused and what adjustments had to be made.

Within a very short amount of time we created an integral way of getting the systems in tune with the existing ceilings, reusing as many of the materials as possible, keeping costs and waste to a minimum.

As a result of our work on the ground floor renovation, we were subsequently assigned to carry out a feasibility study on the adjustments of the remaining floors for making the step towards flexible workplace strategies.