Engineering to turn concept into reality
Through multidisciplinary engineering services and visionary solutions, Arup helped to prove that the ambitious and unprecedented 500 MW offshore wind farm off the coast of Cartagena was feasible. The comprehensive technical documentation and rigorous analysis provided BlueFloat Energy with a solid foundation to face the auction process and prove the project’s competitiveness and potential for further development.
Arup provided a range of services including site feasibility assessments informed by both existing and new data. Our team also reviewed the wind resource study of the proposed site and detailed seabed condition study, leveraging our in-house digital tools to guarantee accuracy. Through these analyses, we identified insights critical to determining which turbines and foundations would maximize performance and cost savings.
Beyond site due diligence, Arup designed a robust and efficient power transmission system and an electrical export system. We performed an optioneering design, including both offshore and onshore components while evaluating potential cable routes and typologies.
The project demanded tailored solutions to address local, technical challenges while working within environmental and logistical constraints. Simultaneously, the project demanded innovative and creative thinking as the country’s most advanced offshore wind project to date. As such, our local presence and knowledge combined with our global expertise in offshore wind enabled our team to serve as an effective partner and advocate for the nation’s ambitious goals.