Fast delivery and international collaboration
The project was completed within approximately eight months, highlighting the increasing speed and maturity of such modern storage developments. The facility was developed and built by ABO Energy, which has extensive experience in delivering battery storage projects. Globally, ABO Energy is currently developing storage projects with a total capacity of around 4 GW. Prior to construction, the project was sold to Field, an international developer, investor and operator of battery storage systems. Field is building a Europe-wide portfolio of battery storage systems and a platform for flexible energy infrastructure.
Independent technical support
Our energy infrastructure experts supported the project as an independent technical partner (Owner’s Engineer) throughout its entire lifecycle, from the start of construction to final handover.
Owner’s Engineering is becoming increasingly important in the renewable energy sector as projects grow ever more complex, capital-intensive and heavily regulated. The integration of various technologies such as wind, solar and storage, as well as increasing requirements for grid connections and system stability, significantly increase interface and project risks. In this environment, owner’s engineering ensures, through independent technical advice and comprehensive project support, that risks are identified at an early stage, quality is guaranteed, and projects are delivered on time and cost-effectively.
For the battery storage facility in Waldkappel, the Energy Infrastructure Team from our Berlin and Frankfurt offices coordinated the interfaces between the project stakeholders, monitored construction progress and ensured that key project milestones were met. In addition, we verified grid compliance and the fulfilment of performance requirements, and developed the commissioning and testing plan, the implementation of which was closely monitored.
During commissioning, our experts monitored key tests and ensured that all agreed performance parameters were met. In addition, the health and safety documentation and as-built records were reviewed to ensure a fully compliant and risk-minimised project.
Supporting the energy transition
As one of the larger stand-alone battery storage projects in Germany, Waldkappel demonstrates how quickly and efficiently flexible energy solutions can be delivered today. The project makes an important contribution to a stable, climate-friendly, and independent energy supply in Europe.